WATER TREATMENT PLANT PROCUREMENTS

Water Treatment Plant Procurements – Sundt Construction

The Willamette Water Supply System (WWSS) Water Treatment Plant (WTP_1.0) is a new, seismically resilient water treatment plant with an initial treated water capacity of 60 million gallons per day. WTP_1.0 is in the City of Sherwood in Washington County, Oregon. The water treatment plant construction will require participation from many subcontractors and suppliers.

A guiding principle established for the Willamette Water Supply System is to provide contracting opportunities that benefit the local economy, provide jobs, and support regional economic development. Sundt Construction (Sundt), the Construction Manager/General Contractor (CM/GC) for the Willamette Water Supply Water Treatment Plant (WTP_1.0) Project, will support this guiding principle to allow and encourage businesses to participate in the opportunity to bid amongst 70+ work categories that will be distributed in three (3) bidding opportunities.  The Portland region is a thriving major metropolitan area with several companies able to perform in each of the work categories needed to construct the WWSS WTP.

WWSP_WTP_NeighMtg_PlanSet_reduced-5-crop
WWSP_WTP_NeighMtg_PlanSet_reduced-8-crop

Prequalification Process

Each bidding subcontractor shall be prequalified by completing Sundt’s web-based process at https://www.sundt.com/subcontractor-portal/. Any questions, comments, or concerns regarding the prequalification process can be directed to prequal@subqual-llc.com or by phone at (800) 407-6192.

Obtaining Bid Documents

All subcontractors and suppliers are encouraged to bid on the specific work categories which include documents prepared for each category. Bid documents are anticipated to be available to Subcontractors and Suppliers for the multiple bidding opportunities as follows:

  • GMP 1: Bid advertises Sept. 21, 2021. Bids due Nov. 11, 2021. Scopes include erosion control, tree protection, tree removal, earthwork, underground yard piping, temporary electrical, long-lead equipment purchases, and more.
  • GMP 2: Bid advertises Nov. 29, 2021. Bids due Feb. 10, 2022. Scopes include structural concrete, structural steel, miscellaneous metals, framing & drywall, flooring, painting, roofing, windows, doors and hardware, electrical and controls, fire alarm, security, fire sprinkler, HVAC and dry mechanical, plumbing, process piping, process equipment installation, remainder of equipment purchases, and more.
  • GMP 3: Bid advertises April 21, 2023 (Tentative). Bids due June 9, 2023 (Tentative). Scopes include curb and gutter, sidewalks and flatwork concrete, asphalt pavement, striping and signage, fencing, landscaping and irrigation, and more.

Electronic copies of the bid documents can be obtained by contacting Brent Edwards of Sundt Construction at PBEdwards@Sundt.com, or by calling (480) 293-3322, to request access to the bid documents. Due to the proprietary nature of certain components of the project, prospective bidders will be required to sign a non-disclosure agreement (NDA) prior to accessing the bid documents on SmartBid.

Upcoming Events

Virtual subcontractor meetings:

Note: Meetings will be recorded and posted to this website for future reference.

TopicDateMeeting Link
GMP 1 General Information MeetingJuly 29, 2021 @ 1:00pm (PST)Click here to join the meeting
Divisions 3 - Structural Concrete, 31 - Earthwork, 33 - Utilities, and 40 - Process Integration (Potential Sundt Self-Perform).August 5, 2021 @ 1:00pm (PST)Click here to join the meeting
Divisions 4 through 14, and 41August 12, 2021 @ 1:00pm (PST)Click here to join the meeting
Divisions 21 - Fire Protection, 22 - Plumbing, and 23 – HVACAugust 19, 2021 @ 1:00pm (PST)Click here to join the meeting
Divisions 26 - Electrical and InstrumentationAugust 26, 2021 @ 1:00pm (PST)Click here to join the meeting
Division 4341 - Wire and Strand Wrapped Prestressed Concrete TankSeptember 2, 2021 @ 1:00pm (PST)Click here to join the meeting
Divisions - 46 Process Equipment SupplySeptember 9, 2021 @ 1:00pm (PST)Click here to join the meeting
Divisions 31 and 32 - Site workSeptember 16, 2021 @ 1:00pm(PST)Click here to join the meeting
GMP 2 General Information MeetingQ4 2021 (TBD)
GMP 3 General Information MeetingQ1 2023 (TBD)

Resources

Our Reliable Water

Program Timeline

Developing the new Willamette water source will take over a decade.